With our client centric outlook and vast experience, we have gained many loyal clients. Our in depth understanding capability and great practical and workable solutions has given us a long list of clients who come back to us only but surely for other project. In the span of 10 years, TRB Surveyors has acclaimed the status of a reputed firm in the field of Land Surveying and consultancy services. This is quite evident from the list of projects and initiatives the company has undertaken in house and though association mention below. The list includes State Government as well as Public Sector and Private projects.

STATE GOVERNMENT

LAND ASSIGNMENT SURVEY OF 2329 HOUSE PLOTES - KUTTIYARVALLEY.
CLIENT: Grama Panchayathu, Devikulam, Munnar, Idukki
PROJECT PERIOD: JULY 2010 – DECEMBER 2010
GPS Services
BACKGROUND :
The project envisages the setting out of house plots, roads, common and shop area over an area of 200 acres of land. Each plot has the area of 5 cents. The work is carried out as per the Government Order GO (MS) No.394/08 REVENUE (A) Department Thiruvananthapuram. There are 2329 house plots were set out. The site is KUTTIYAR VALLEY, situated near the munnar town at idukki District.

PROJECT PRINCIPLES :
The project envisages the demarcation of 2329 house plots. Each plot has area of five cents, also demarcate roads in between each plots. Using Total Station to fix the corners of each plot and fix mark on the land. After completing each plot, put an identification number.

RESULT:

  • Site plan prepared for each house plots of total 2329 plots.
  • Fix plot boundaries.
  • Durably demarcated with survey stones for each house plots.

WATER SHED MANAGEMENT PROGRAMM – M.G UNIVERSITY CAMPUS
CLIENT : Advanced centre of Environmental Studies and Sustainable Development, M.G. University, kottayam.
PROJECT PERIOD : JULY 2011 – AUGUST 2011
GPS Services BACKGROUND:
The Water Shed management Program is the feasibility study of water management in campus area. The intension of the survey is to study, the quantity of water flows over the ground and how much amount of the water can store in the pool situated in campus area. The total area of land to be surveyed is around 50 acres.
PROJECT PRINCIPLES :
Establish control points (Bench Marks) based on UTM co-ordinates using DGPS. Doing topographical survey based on these control points using Total Station. Taken different levels of earth surface and contour survey.
RESULT:

  • Establish two Bench marks based on UTM Co-ordinates using DGPS.
  • Contour Map prepared for campus area.


PROPERTY SURVEY FOR LAND ACUISITION – KSEB MANKULAM,MUNNAR
CLIENT : Kerala State Electricity Board
PROJECT PERIOD : JULY 2008 – SEPTAMBER 2008
GPS Services BACKGROUND:
The Project is intended to demarcate the area of each holdings of land in either sides of Malachery River at Mankulam-Munnar, which are acquired to 80 MW HYDRO ELECTRIC PROJECT, KSEB. The total area to survey is around 75 acres of land.

PROJECT PRINCIPLES :
The Project envisages durably Demarcate each holding situated in the 80 MW HYDRO ELECTRIC PROJECT areas. There are total 250 holdings. First step is demarcation of holdings, then take total boundary area using Total Station.

RESULT

  • Durably Demarcate 250 holdings.
  • Each holdings are surveyed using Total Station and calculate the area.
  • Prepared individual site maps and Group Sketch of Total holdings.


PREPARATION OF GPS BASED MEASURED SCHOOL CAMPUS PLAN(MSCP) – SARVA SIKSHA ABIYAN(SSA),ALAPPUZHA DISTRICT
CLIENT : DISTRICT PROJECT OFFICER (SSA), ALAPPUZHA, KERALA
PROJECT PERIOD : DECEMBER 2012 – JANUARY 2013
GPS Services BACKGROUND:
The project is intended to carry out total station survey and preparation of GPS based data base of 336 Government schools in Alappuzha Districts. The entire survey work shall be converted on GIS platform by using GPS Coordinates.

PROJECT PRINCIPLES :

  • Preparation of GPS based, measured school campus plan.
  • Collection of all topographical details to prepare map of all the schools.
  • With the help of GPS and Total station data, prepare the map as per corrected coordinates.



HOUSE HOLD SURVEY FOR PREPARATION OF GIS BASED PROPERTY TAX MAPPING
CLIENT : PALAKKADU MUNICIPALITY
PROJECT PERIOD : JANUARY 2011 – APRIL 2012
GPS Services BACKGROUND:
The project is intended to carry out GPS based house hold survey and preparation of consumer index data base of 17000 no’s property in Palakkadu Municipality. All collected survey data is compatible to integrate in GIS platform.






PREPARATION OF MEASURED SCHOOL CAMPUS PLAN(MSCP) – SSA KOLLAM DISTRICT
CLIENT : DISTRICT PROJECT OFFICER (SSA), KOLLAM, KERALA
PROJECT PERIOD : JANUARY 2013 – MARCH 2013
GPS Services BACKGROUND:
The project is intended to carry out total station survey and preparation of MSCP data base of 426 Government schools in kollam Districts. The entire survey work shall be converted to autocad drawings by using the total station data.

PROJECT PRINCIPLES :

  • Preparation of measured school campus plan.
  • Collection of all topographical details to prepare map of all the schools.
  • With the help of total station data, prepare the map by using auto CAD software’s.




EXISTING ROAD SURVEY FOR PREPARATION OF DEATILED PROJECT REPORT(DPR) OF EXISTING ROADS UNDER PMGSY SCHEME IN KOLLAM DISTRICTS
CLIENT : Kerala State Rural Road Development Authority/GITPAC Trivandrum.
PROJECT PERIOD : OCTOBER 2012 – DECEMBER 2012
GPS Services BACKGROUND:
The project is intended to conduct detailed topographic survey of Different Rural Road Alignments and preparation of cross sections on every 50mts and Longitudinal Sections.






TOPOGRAPHICAL SURVEY FOR PREPARATION OF DEATILED PROJECT REPORT
CLIENT : Road Infrastructure Company Kerala Ltd/Wilbur smith Associates Bangalore
PROJECT PERIOD : NOVEMBER 2012 – JANUARY 2013
GPS Services BACKGROUND:
The project is intended to conduct detailed Level survey of Different Road Alignments (351Kms) for preparation of Detailed Project Report (DPR) for the Rehabilitation Contract packages of Kerala State Road Improvement Project.






TOPOGRAPHICAL SURVEY & TBM INSTALLATION OF UPPER AND LOWER PORTION OF BHAVANI RIVER & VARAGAR RIVER-AGALI
CLIENT : Irrigation Dept of Kerala (Executive Engineer, Bhavani basin division, Agali)
PROJECT PERIOD : JULY 2013 - ONGOING
GPS Services BACKGROUND:

  • Conducting Topographic Survey and preparing contour map showing 2m interval contours using ETS (Electronic Total station) or DGPS or such approved methods or its combinations thereof showing all topographic features like buildings, wells(open and tube wells) water ways/water bodies like ponds, canals, railway tracks, major and minor roads (pucca and kucha) including culverts and crossings, survey stones and other permanent objects like telephone post, electric post and transmission towers of the entire area and taking & recording of river cross sections at every 100m.
  • Preparation and submission of survey reports with maps (Plan, Cross-sections, Longitudinal Sections.etc).
  • Plan in 1:5000 scale for CS H:1000 and V:100 indicating the contour lines 2m interval in digitized forms of standard computer software AutoCAD including supplying of two soft copies CD/DVD, ten hard copies of colour print out in A0 size.


PROJECT PRINCIPLES :
  • Conducting GPS/GNSS based Topographical survey of an area about 1500 acres of land to collect all the details of upper and lower portion of Bhavani River & Varagar River.
  • Taking contours (spot levels) of an every 2m interval.
  • Taking cross section of river at an every 100m interval.
  • Establishing of TBM pillars as per the work order.
  • Preparation of contour maps with the help of the surveyed data.




ROUTE AND LEVEL SURVEY WORK FOR WSS (JALANIDHI) IN VARIOUS GRAMA PANCHAYATH IN KOTTAYAM DISTRICT
CLIENT : Jalanidhi(Various SO for each Grama Panchayath)
PROJECT PERIOD : July 2013 – ONGOING
GPS Services BACKGROUND:

  • The junction chain age, levels and names should be correctly marked in the drawing.
  • The landmarks such as Houses, Electric poles, Transformers, Roads etc. should include in the survey detail.
  • The important institutions/monuments, etc. should be clearly marked in the map.
  • Submission of the detailed survey map in hard copy (1 copy) in the scale as specified by the authority as well as the soft copy in CD in AutoCAD format for fulfilling the work.


PROJECT PRINCIPLES :
  • Conducting ETS based Level & Route Survey of the length about 500 Kilometers of route to collect all the details such as chainages and RL’s.
  • Carry out the route survey of pumping line and distribution line as per the direction of Project Management.
  • Preparation of AutoCAD drawings by showing all the survey details such as Elevation, Chainages, important institutions/monuments, Houses, Electric poles, Transformers, Roads etc.
  • Submission of the detailed survey map in hard copy (1 copy) in the scale as specified by the authority as well as the soft copy in CD in AutoCAD format for fulfilling the work




PUBLIC SECTOR

Smart City Project, KOCHI
CLIENT : Smart City Kochi .
PROJECT PERIOD : On Going
GPS Services BACKGROUND :
Smart City Kochi is to be developed on 246 acres of land in Kakkanadu area which is about 20 km from the city centre and about 20 km from the International Airport. Smart City Kochi (SCK) is a joint venture between Smart City Dubai and the Government of Kerala (GoK). The total development is spread over 246 acres, in the Kakkanadu area, Kochi in Kerala State comprising 3 land parcels with the following approximate land parcel split

Land A: Area: 131 acres (32 survey nos, 398 subdivisions)
Land B: Area: 100.65 acres (18 survey nos, 348 subdivisions)
Land C: Area : 13.94 acres (1 survey no, 3 subdivisions).

Scope of the Project :
• All land demarcation maps to be collected from relevant authorities / village office of the three Land areas.
• All land boundary corners (points of change of direction) are to be determined by coordinates (north, east).
• All boundary corners are to be physically located by Global Navigation Satellite System (GNSS) or ground survey or a combination of these methods.
• All boundary corners are to be marked with permanent, durable monuments and be readily identifiable.
• The survey is to be connected to the State/Local control station (benchmarks) or local geodetic grid with an absolute positional accuracy of 0.01 meter.
• Plans of the survey shall be prepared including coordinate lists of boundary corners and permanent reference markers and shall be checked against legal land map. <
• Preparation of survey plans and documentation as required, including ‘signing off’ of survey for purposes of land registration.
• Obtaining any approval(s) of surveys as may be required by relevant Authorities.
• Verification of SCK legal drawings that defines the lands’ perimeter in relation to the State/Local control station (benchmarks) in order to utilize the same in demarcation of the land and determination of the coordinates.
• Verify existing topographic (level) survey data and undertake the required survey to establishment of levels and contours in Land (A, B & C) which are not covered in the existing topographic survey in order to provide and produce a complete topographic survey for all land areas.
• Establish and plot the physical location of the existing fence around Land A and identify any discrepancies.
• Establishment of control points in each Land area.
• Classify wooded Land areas as ‘dense’, ‘medium’ or ‘light’ and indicate the same on the topographic drawings.
• The survey shall be carried out to determine coordinates and elevations of any physical features/structure existing on the Land (A, B & C). This shall include but not limited to:
a. Buildings
b. Fence
c. Walls
d. Other findings
• Upon completion of the survey, the Surveyor shall submit for the Client’s for approval (3 hard copies and 1 soft copy) the followings:
• The survey plan (A0 size) at a scale of 1:1000 that shows the coordinates and the associated list.
• Topographic survey for all areas including the indication of the wooded lands and existing structures.
• Cross sections showing variation of levels at appropriate scale for the whole land areas (A, B & C).


HFCL Mumbai
CLIENT : HFCL Mumbai .
PROJECT PERIOD : On Going
GPS Services BACKGROUND :
Lat long survey for road using hand held GPS (Juno Series by trimble) for about 800 kms at every 500m details along different road alignments in entire kerala for the feasibility of underground optic fiber cable laying.




TOPOGRAPHIC SURVEY FOR 46 ACERS OF LANDS PARCEL – TAJ HOTELS
CLIENT : TAJ Group -Indian Hotels Company Ltd., Mumbai.
PROJECT PERIOD : SEPTAMBER 2011 (20 DAYS)
GPS Services BACKGROUND :
Topographical Survey shall be carried out covering the entire site and mark all existing details that includes pathways, levels, cluster, compound wall, Boundary line, Rock, road & Culverts with their in IL, pavement, plinth protection, Gate & Gate posts, platforms, Buildings, substation & 2 pole structure, Lamp posts, Trees, Lawns & hedges, swimming pool, Temple, open drains & public sewers water & electrical lines, Bore well, Reclaimed land, marshy land, water tank, cultivation land, mangroves, back water sections within the plot area etc.

PROJECT PRINCIPLES :

  • Marking average levels and contour of site with respect to the curb of the adjacent road including the details of the surface drain adjacent to the main road touching the property with its invert level.

  • Clearly mark the High Tide Line for the land parcel that would be used for measurement of distances in accordance with CRZ norms

  • Existing land use pattern to be clearly highlighted (agriculture, non- agriculture, forest, water bodies, low lying water collectible areas, shortest distances from the periphery of the project to periphery of the forest, national park, wild life sanctuary, ecosensitive area, water bodies (Distance from the HFL of the river)

  • Marking property line layout as per site and demarcating all structures surrounding the site as well as all important structures within a radius of 500m.

  • Marking location of permanent structure at site if any.

  • A grid of 5.0m along both axes shall be established while marking the contour levels at site and the contours could be at an interval of 1 m.

  • Establish Bench marks (with reference to permanent BM on Govt. survey dept) at ground level.
RESULT
  • Prepared one set of colour prints of all the drawings as elaborated in the scope of work.

  • Provide above data in a CD in AutoCAD 2007 format.



GPS BASED BOUNDARY SURVEY OF 161 ACERS LAND – INFO PARK, KOCHI
CLIENT : INFO PARK, KOCHI.
PROJECT PERIOD : JULY 2011 – DECEMBER 2011
GPS Services BACKGROUND :
The project envisages the fixing of boundary point of the acquired land for INFO PARK, Kakkanadu. The Proposed survey area is 246 acres. To fix the control points using GPS. The survey is carried out by using Total Station machine to fix the boundary points based on the Control points.

PROJECT PRINCIPLES :
Establishing UTM Co-ordinate (using WGS-84 datum) based GPS control points in different places on the surface of INFO PARK project area. After establishment of the control points, re-fix the property boundary along with banks of Kadaparayar and other places.

RESULT

  • The boundary re-fixing of the property will be done conventional method using Total Station machine, later the marked points will be incorporated into GPS data base, so that even if a re-fixed point is lost can easily find out the lost point from the GPS data base.

  • This GPS data base can also be used for creating GIS mapping.


RL SURVEY OF ABOUT 100 WELLS IN AND AROUND KMML AT CHAVARA, KOLLAM.
CLIENT : CSIR-NIIST, Trivandrum
PROJECT PERIOD : Nov 2013 – Jan 2014
GPS Services BACKGROUND:

  • Establishing of 4 GPS points on permanent structures.
  • Reduced Level Survey of about 100 wells in and around KMML iron oxide ponds using Total Station. The study area shall be 2 km radius keeping the KMML iron oxide ponds at the centre. The premises of the KMML shall also be demarcated in the map showing the extent of the iron oxide ponds and RL along its periphery i.e. east, west, north and southern sides.
  • Numbering / Marking of measured well location using yellow paint on the curb/ top parapet
  • a)Measurement of water level in the well from the top of parapet/ curb b)Height of parapet/ curb from ground level & c) Measurement of total depth of well ( These to be determined as RL from the measured wells)
  • Preparation of water level contour map of the surveyed area from the data generated by field measurement (RL of water levels in the wells) using AutoCAD software.
  • Submission of drawings and reports of the surveyed area. The drawing should show the movement/ flow direction of ground water in the study area.


PROJECT PRINCIPLES :
  • The main principal of this project is to find out the RL’s of 100 wells in and around of KMML site by using ETS & DGPS instruments.
  • After getting the levels of well, preparation of contour map by using Auto CAD software.
  • Submission of drawings by showing the contours, movement/ flow direction of ground water in the study area.
  • Submission of drawings and reports of the surveyed area.




PLOT DEMARCATION WORKS AT SCK LAND PARCELS-247 ACRES
CLIENT :SCK- Smart City Kochi
PROJECT PERIOD : Feb 2014 – ONGOING
GPS Services BACKGROUND:

  • Marking/setting out of all the corners and deviations with respect to the plots as per the direction of SCK by using total station.
  • Precast, transportation and installation of boundary pedestals (60 cm above ground) of 1m height (Reinforced concrete with 100mm diameter PVC Pipe encasement) and providing separate color flags in Steel rods (10mm dia & 1.7m length) of 1.2 meter above ground nearby the pedestals.
  • Painting (Yellow color) and Marking of point ID number in major pedestals.
  • Providing separate color flags in Steel rods (10mm dia & 1.7m length) of 1.2 meter above ground between the major pedestals.
  • Clearing the vegetation (Line clearing) for setting out works.
  • Preparation and Submission of plans (plot wise) by showing survey numbers/ subdivision numbers, area as per the revenue records (in soft and hard copies).
  • Preparation and Submission of plan (plot wise) showing the entire boundary pedestal coordinates (in soft and hard copies).
  • Providing the nearest Datum points (GPS points) for the each plots demarcated.







PRIVATE CLIENTS

TOPOGRAPHIC SURVEY FOR 70 ACERS OF LANDS PARCEL – KANTHALLOOR
CLIENT : M/s CIVET CAT ORCHADE PVT. LTD, KANTHALLOOR, MUNNAR
PROJECT PERIOD : MARCH 2008 – APRIL 2008
GPS Services BACKGROUND :
Topographical Survey shall be carried out covering the entire site and mark all existing details in company plantation area.




PROJECT PRINCIPLES :

  • Conduct a boundary survey to fix the boundaries of company plantation.

  • Detailed topographical survey to prepare the contour map for company plantation
RESULT
  • Re-fix the plantation boundaries.

  • Prepared detailed land and contour map for plantation.

  • Provide above data in a CD in AutoCAD 2007 format.


LAT/LONG MAPPING OF 96 SC COLONIES IN PATHANAMTHTTA, ALAPUZHA,KOTTAYAM, KANNUR AND MALAPURAM DISTRICTS
CLIENT : Kerala SIDCO/GITPAC International.
PROJECT PERIOD : Jan.2012- March.2012
GPS Services BACKGROUND:
The project is for the preparation of DPR for various development activities in the SC Colonies through Karala SIDCO as the lead Consultant.TRB surveyors has done DGPS survey for preparing layouts of colonies with all micro level interventions plotted in it.






Ground Control Point , Aroor town & Alappuzha Town
CLIENT :SAGISOL TECHNOLOGY SERVICES PRIVATE LIMITED
PROJECT PERIOD : APRIL 2014 – ONGOING
GPS Services BACKGROUND:

  • Collection of maps/required sketches
  • Establishing GCP control points
  • Submission of GCP points List







GPS BASED DETAILED SURVEY OF 800 ACERS LAND – IDUKKI TOWN SHIP
CLIENT : DISTRICT PANCHAYATH, IDUKKI. GOVT OF KERALA.
PROJECT PERIOD : NOVEMBER 2011 – On going
Land Survey BACKGROUND :
The project is intended to conduct a detailed topographic survey using UTM co-ordinate system of 800 acres of land owned Idukki District panchayath, preparing the master plan for ECO Town Ship Idukki.



PROJECT PRINCIPLES :

  • Re-fixing the outer boundaries of 8 parcels of land owned by Idukki District Panchayath.

  • Sub Division survey of land allotted to Govt. and queasy Govt. agencies.

  • Marking of un authorised occupends(encroachers).

  • Collect present topographical details to prepare the Ecological friendly Master plan for ECO Town ship, Idukki.